|
|
|
|
|
|
|
|
|
|
|
Click
here to see what happens when good grinders go bad...)
--June 2002--
Getting started hanging the uppers. Almost put in the lowers first, but I had a hard time reaching to put the screws in in the uppers, so we did it this way. The board below helped a lot with supporting and levelling. June 2002 |
It was actually a little easier than we thought it would be. It took almost 1/2 of Sunday, and father stopped by for moral support, but we got them hung level and secure. June 2002 |
You can see I got impatient and hung before painting. Still, I did wait til the sheetrock was up... June 2002 |
Still so much to do. Concrete countertop (if it works), tile, sink, faucet, stove, handles, and get the missing cabinet that I had to reorder because I mis-sized. June 2002 |
Facing South. The future island is marked out on the floor. The short wall will hold the electrical and give the cabinets something to attach to. May 2002 |
The new cabinets are in. We had a local cabinet maker make the boxes and bought the Thomasville doors from Home Depot. Here I've just started painting with primer. May 2002 |
Now with the new window which will be over the future sink. April 2002 |
I love the view. April 2002 |